Four Seasons Marrakech
Four Seasons Marrakech
Project : Refurbishment and fitout of the Four Seasons Hotel and Resort touching the redesign of 114 rooms and 25 suites, the lobby and the restaurant (Construction activities in an occupied environment).
Client :Westmont Hospitality Group
Architect : Atelier Pod
Assignment : Project Manager, Quantity Surveyor, FF&E Consultant, Sourcing and Procurement Agent. MAGESPRO Africa was engaged to revitalise guest rooms to reflect international design standards and best-in-class expectations of this five-star brand. Critically, the hotel remained in operation with construction works taking place in a live environment. Entire work was carried out without closing the hotel for a single day. The staging considered maintaining optimum occupancy rates through adequate task sequencing.
Localization : Marrakech – Morocco
Duration : 2023
Surface : 16 hectares
Budget : 8 000 000 USD